Following a site survey, ideally prior to the contract commencing, all assets are recorded and data for these uploaded into the Safewater Monitoring and SchedulerM Reporting System. The programme will be designed to ensure compliance to L8 ACOP and HSG274 Part 2 guidance.

Phase Technology technicians will then then visit the site as applicable inline with the written scheme of control undertaking the Safewater/L8 monitoring tasks including:

  • Weekly low use outlet flushing
  • Monthly Sentinel Outlet temperature monitoring
  • Monthly Calorifiers temperatures
  • Tank Inspections
  • Calorifier inspections
  • Annual Outlet temperature monitoring


Phase Technology can undertake all or any of the monitoring and inspections that are required for the premises.